Dubai  

Back  Home Page 
Palm Island Jumeirah

The project consists of designing, installing, owning and operating LPG gas pipeline distribution networks that are initially fed by central LPG tank farms. This will include installation of Synthetic Natural Gas (SNG) facilities to facilitate more efficient conversion to natural gas upon availability. Scope of work includes all installation from the inlet of the tank farm to the customer appliance (commercial & residential). The pipeline network is constructed of PE piping and includes all valves, regulators, and metering necessary for operating a safe system. Also included in scope are safe and reliable operations and maintenance services for a Concession period of 30 years. This project will consist of an estimated 55,000 meters of gas mains and gas service for over 2,500 residential & 9,000 flats, more than 47 Hotels and many other commercial customers.

Lootah BCGas designed, procured, constructed, and tested the LPG pipeline infrastructure & tank-farm installation, and provides Operation and Maintenance services for a period of 30 years. These services include 24-hour call center & emergency response, connecting, disconnecting & billing customers, collection of gas revenue from customers, provision of reliable & safe gas supply, regular patrols and surveys, and performance of all necessary repairs.

Discovery Gardens Group
  • Mogul 3
  • Jebel Ali Village
  • Al Furjan

The project consists of designing, installing, owning and operating LPG gas pipeline distribution networks that are initially fed by central LPG tank farms. This will include installation of Synthetic Natural Gas (SNG) facilities to facilitate more efficient conversion to natural gas upon availability. Scope of work includes all installation from the inlet of the tank farm to the customer appliance (commercial & residential). The pipeline network is constructed of PE piping and includes all valves, regulators, and metering necessary for operating a safe system. Also included in scope are safe and reliable operations and maintenance services for a Concession period of 30 years. This project will consist of an estimated 120,000 meters of gas mains, six 50 ton below ground LPG Tanks and SNG System convertible to Natural Gas, including two SNG Tank Farms, which serve over 75,000 customers.

Lootah BCGas designed, procured, constructed, and tested the LPG pipeline infrastructure & tank-farm installation, and provides Operation and Maintenance services for a period of 30 years. These services include 24-hour call center & emergency response, connecting, disconnecting & billing customers, collection of gas revenue from customers, provision of reliable & safe gas supply, regular patrols and surveys, and performance of all necessary repairs.

Hillside Gardens

The project consists of designing, installing, owning and operating LPG gas pipeline distribution networks that are initially fed by central LPG tank farms. This will include installation of LPG Tank facilities. Scope of work includes all installation from the inlet of the tank farm to the customer appliance (commercial & residential). The pipeline network is constructed of PE piping and includes all valves, regulators, and metering necessary for operating a safe system. Also included in scope are safe and reliable operations and maintenance services for a Concession period of 30 years. This project will consist of an estimated 4,000 meters of gas mains and two above – ground 4 ton LPG Tanks which serve over 208 residential villas customers.

Lootah BCGas designed, procured, constructed, and tested the LPG pipeline infrastructure & tank-farm installation, and provides Operation and Maintenance services for a period of 30 years. These services include 24-hour call center & emergency response, connecting, disconnecting & billing customers, collection of gas revenue from customers, provision of reliable & safe gas supply, regular patrols and surveys, and performance of all necessary repairs.

Jumeirah Islands

The project consists of designing, installing, owning and operating LPG gas pipeline distribution networks that are initially fed by central LPG tank farms. This will include installation of LPG Tank facilities. Scope of work includes all installation from the inlet of the tank farm to the customer appliance (commercial & residential). The pipeline network is constructed of PE piping and includes all valves, regulators, and metering necessary for operating a safe system. Also included in scope are safe and reliable operations and maintenance services for a Concession period of 30 years. This project will consist of an estimated 20,000 meters of gas mains and one below – ground 15 ton LPG Tank which serve over 736 residential villas customers.

Lootah BCGas designed, procured, constructed, and tested the LPG pipeline infrastructure & tank-farm installation, and provides Operation and Maintenance services for a period of 30 years. These services include 24-hour call center & emergency response, connecting, disconnecting & billing customers, collection of gas revenue from customers, provision of reliable & safe gas supply, regular patrols and surveys, and performance of all necessary repairs.

Jumeirah Village South

The project consists of designing, installing, owning and operating LPG gas pipeline distribution networks that are initially fed by central LPG tank farms. This will include installation of Synthetic Natural Gas (SNG) facilities to facilitate more efficient conversion to natural gas upon availability. Scope of work includes all installation from the inlet of the tank farm to the customer appliance (commercial & residential). The pipeline network is constructed of PE piping and includes all valves, regulators, and metering necessary for operating a safe system. Also included in scope are safe and reliable operations and maintenance services for a Concession period of 30 years. This project will consist of an estimated 56,000 meters of gas mains, 9 to 18 - 75 ton below ground LPG Tanks and SNG System convertible to Natural Gas, which serve over 99,000 residential units, 6,700 hotel rooms, 780 Retail and commercial outlets.

Lootah BCGas designed, procured, constructed, and tested the LPG pipeline infrastructure & tank-farm installation, and provides Operation and Maintenance services for a period of 30 years. These services include 24-hour call center & emergency response, connecting, disconnecting & billing customers, collection of gas revenue from customers, provision of reliable & safe gas supply, regular patrols and surveys, and performance of all necessary repairs.

International City

The project consists of designing, installing, owning and operating LPG gas pipeline distribution networks that are initially fed by central LPG tank farms. This will include installation of Synthetic Natural Gas (SNG) facilities to facilitate more efficient conversion to natural gas upon availability. Scope of work includes all installation from the inlet of the tank farm to the customer appliance (commercial & residential). The pipeline network is constructed of PE piping and includes all valves, regulators, and metering necessary for operating a safe system. Also included in scope are safe and reliable operations and maintenance services for a Concession period of 30 years. This project will consist of an estimated 56,000 meters of gas mains, 9 to 12 - 50 ton below ground LPG Tanks and SNG System convertible to Natural Gas, which serve over 95,000 residential units and various commercial customers.

Lootah BCGas designed, procured, constructed, and tested the LPG pipeline infrastructure & tank-farm installation, and provides Operation and Maintenance services for a period of 30 years. These services include 24-hour call center & emergency response, connecting, disconnecting & billing customers, collection of gas revenue from customers, provision of reliable & safe gas supply, regular patrols and surveys, and performance of all necessary repairs.

Dubai Festival City - Al Futtaim

LP Gas Farm and Site Wide Gas Infrastructure
EPC and Operations & Maintenance

Scope of EPC works includes the design, construction, testing and commissioning of all structural mechanical and electrical plant and equipment necessary for the provision of the required gas storage, supply, and reticulation system to the developments within several zones of Dubai Festival City. The gas is to be connected to the required building developments through a pipe reticulation network. Lootah BCGas was also responsible for the detailed design and construction of the LPG gas/Tank Farm, including architectural, civil and structural works.

Separately, Lootah BCGas is contractually responsible for Operations and Maintenance of the system.The System serves Residential houses, apartments, shopping centers, restaurants, hotels and resorts along Dubai Creek.

Lootah BCGas designed, procured, constructed, and tested the LPG pipeline infrastructure and tank-farm installation, and provides Operation and Maintenance services. These services include 24-hour call center & emergency response, connecting & disconnecting customers, provision of reliable & safe gas supply, regular patrols and surveys, and performance of all necessary repairs.


EMAAR Communities

LP Gas Operating Projects - EMAAR

  • Burj Khalifa
  • The Dubai Mall
  • The Greens
  • Emaar Business Square
  • Arabian Ranches
  • Dubai Marina Walk
  • The Town Center

All of Emaar communities in Dubai with Central Gas Distribution Systems, including Burj Khalifa community and Dubai Mall with several thousand residential customers, thousands of hotel rooms, hundreds of shops and over hundreds of restaurants. Other Operating projects are The Greens, Emaar Business Square, Arabian Ranches, Dubai Marina Walk & The Town Center.

Burj Khalifa is a magnificent development of high rise commercial buildings, high rise residential buildings and low rise residential complexes . The Burj Tower, Dubai Mall and many hotels and resort facilities are also in the development. The area is served with gas from a number of strategically located tank sites and gas distribution systems provide gas throughout the area.

Through a gas-system lease arrangement, Lootah BCGas is the comprehensive operator of these systems, including all aspects such as customer billing, emergency response, maintenance and all that is involved in the safe and reliable supply of gas. This commenced with the Old Town Commercial Island area in October 2007 and is to be followed by the Burj Residence area in March 2008 and expands as each new area of the project is completed .This also includes operations and maintenance of the LPG gas distribution system in the Burj Khalifa, the World’s tallest building.


Recently Completed Projects

The Palm Atlantis
Engineering, procurement, construction and operation & maintenance of the internal gas piping system.

United Gas Transmissions Company Limited (UGTCL)
Design and construction of high pressure pipelines with bypasses, including Enterprise resource planning and environmental impact assessment.

Twin Sub-Sea Pipelines
Design and installation of 3.2 km of sub-sea gas distribution pipeline.





Lootah BCGas
Global Measurement & Control Solutions (GMCS)
S.S. Lootah International
S.S. Lootah Group
Al Qudra Holding